OEM Program
Your brand.
Derya build quality.
Derya supplies magazines, barrels, slides, parts, accessories and firearms to approved manufacturers and private-label brands, from in-stock unbranded product to builds made to your specification. We manufacture in Konya, Türkiye and Jacksonville, Florida, and every OEM project runs through one tracked process from intake to shipment.
Who qualifies
Manufacturers
Firearm and accessory manufacturers that build or assemble products sold under their own name.
Private-label brands
Brands that sell finished products under their own established brand.
Dealers, retailers and distributors buy Derya catalog products through our authorized distributors. Consumers buy from Derya authorized dealers.
How it works
Apply
Submit the OEM account application with your license or business documents. We review applications within 5 business days. Approved accounts receive OEM pricing and access to projects and bulk orders.
Start a project
For private-label, custom, component and new-model work. Each project moves through eight tracked stages, and you always know what is waiting on you.
All 8 stagesPlace a bulk order
For in-stock, unbranded magazines, barrels, slides, other parts and accessories. Submit your purchase order and your order ships within 10 business days, unless an item is out of stock.
Starts at stage 5Intake
We accept, decline or ask for more information within 5 business days.
NDA
Derya's mutual NDA by e-signature when your project needs one, or upload an NDA already in force.
Specs and artwork
Specifications, vector artwork, marking text, color references, packaging and UPC details.
Proof
Approve the marking layout or proof, or request changes.
Quote, PO and deposit
Written quote. Your purchase order and cleared deposit start the lead time.
Golden sample
Approve the pre-production sample within 10 business days.
Production
Built and inspected, with status updates as it moves.
Shipment
Balance paid, order ships and tracking is posted.
Programs and minimum order quantities
| Program | What it covers | Minimum order | Typical lead time | Payment |
|---|---|---|---|---|
| OEM Bulk Orders | In-stock, unbranded magazines (200 per master case), barrels (24 per master case), slides, other parts and accessories | $10,000 per purchase order; items may be mixed; magazines and barrels in full master cases | Ships within 10 business days, unless out of stock | Approved terms, or prepayment |
| Components | Tubes, springs, followers, base plates or other individual parts of a standard Derya item, ordered on their own. This is a custom order. | 1,000 per part per configuration | 90 to 120 days | 50% deposit; balance before shipment |
| Private-Label Magazines | Your logo or marking on a Derya stock magazine, and/or your bag label and UPC | 1,000 per SKU per artwork | 90 to 120 days | 50% deposit; balance before shipment |
| Custom Magazines | Custom color, follower, base plate, capacity or new magazine pattern | 5,000 per SKU per configuration | 150 to 210 days, including tooling | Tooling in full with PO; 50% deposit; balance before shipment |
| Private-Label and New-Model Firearms | Your branded models, design changes or new tooling | 500 units first order, with a 12-month volume forecast | Quoted per project | Tooling in full with PO; 50% deposit; balance before shipment |
Lead times run from the later of your cleared deposit and your approval of the final proof or golden sample. They are estimates, not guaranteed delivery dates.
Pricing and payment
Pricing
We don't publish OEM pricing. Bulk pricing is sent when your account is approved. Project pricing comes in a written quote, valid for 30 days.
Deposits
Non-standard products take a 50% deposit with your PO, with the balance due before shipment. Tooling is paid in full with the PO.
Standard OEM Items
Once a custom item's first run ships and supply is steady, we can make it a Standard OEM Item for your account. Reorders then ship on your approved terms with no deposit.
Derya OEM Program Terms
The Derya OEM Program supplies magazines, parts, accessories and firearms to approved manufacturers and private-label brands, either as in-stock bulk product or as products built to the Buyer's specification. Derya manufactures in Konya, Türkiye and Jacksonville, Florida. In these OEM Program Terms, "Buyer" means the approved OEM account placing an order, and "Products" means the goods Derya supplies under this program.
1Program overview and eligibility
1.1 Who qualifies. The OEM Program is open only to:
- Firearm and accessory manufacturers that build or assemble products sold under their own name; and
- Private-label brands that sell finished products under their own established brand.
1.2 Who does not qualify. Dealers, retailers and distributors buying standard Derya catalog products for resale purchase through Derya's authorized distributors. Consumers purchase through Derya's authorized dealers. Export inquiries are handled by Derya's global team and must state the destination country.
1.3 Account approval. Every Buyer must complete the Derya OEM account application and be approved by Derya before Derya accepts a purchase order. Derya may approve or decline any application at its sole discretion.
1.4 Required documents. Any project involving firearms requires a current Federal Firearms License on file with Derya before Derya ships. Buyers of magazines, parts or accessories only must provide a resale certificate or other proof of business status. Derya may request additional documents at any time.
2Programs and minimum order quantities
Each order must meet the minimum order quantity (MOQ) for its program, as shown in the Programs and Minimum Order Quantities table on this page. Programs other than OEM Bulk Orders are non-standard products and require a deposit (Section 3).
2.1 Lead times. Lead times run from the later of Derya's receipt of the deposit and Buyer's approval of the final proof or golden sample. They are estimates, not guaranteed delivery dates.
2.2 Case quantities. Magazines and barrels ship in full master cases; other parts and accessories ship in the quantities ordered. Firearms ship in full master-case quantities as shown on Derya's price list.
2.3 Run variance. Custom Magazine runs may ship within 5% over or under the ordered quantity and are invoiced at the quantity shipped. Firearm quantities ship as ordered.
2.4 Components. Tubes, springs, followers, base plates and other individual parts of a standard Derya item, ordered on their own, are custom orders even when the finished item is a standard catalog product. They are made to order with a typical lead time of 90 to 120 days and follow the deposit terms in Section 3.3.
3Pricing, payment and deposits
3.1 Pricing. Derya does not publish OEM pricing. OEM Bulk Order pricing is provided to Buyer on account approval. Pricing for all other programs is provided in a written project quote after Derya accepts the project. Quotes are valid for 30 days.
3.2 Payment methods. Payment is by check, ACH or wire transfer only. Derya does not accept credit cards.
3.3 Deposits. For every non-standard product, a deposit of 50% of the order value is due with Buyer's purchase order, and Derya does not schedule production until the deposit has cleared. The balance is due before Derya releases the order for shipment. Tooling and engineering (NRE) charges are due in full with the purchase order. Deposits and tooling payments are non-refundable once Buyer has approved the proof or golden sample and Derya has placed production with its factory or supplier.
3.4 Payment terms. Payment terms are available only to accounts approved through Derya's credit application. Approved accounts receive Derya's standard terms of 2% 10, Net 30, subject to the credit limit Derya assigns. Accounts not approved for terms prepay before shipment. Approved terms apply to OEM Bulk Orders and Standard OEM Items; the first production run of any non-standard product follows Section 3.3 whatever Buyer's terms status.
3.5 Standard OEM Items. After a non-standard product's first production run has shipped and been accepted, and Derya has established steady supply of it, Derya may designate it a Standard OEM Item for that Buyer by written notice. Reorders of a Standard OEM Item in the same specification ship on Buyer's approved payment terms without a deposit, at the same MOQ unless Derya agrees otherwise in writing. Any change to the specification returns the item to Section 3.3.
3.6 Freight and taxes. Freight, title, risk of loss and federal excise tax follow Derya's Terms and Conditions for orders shipped from Jacksonville. Shipments Derya agrees to make directly from its Konya factory are quoted separately and require Buyer to hold every license and permit that shipment requires.
4Project process
Every non-standard project moves through these stages in order, and a stage opens only when the one before it is complete. Stages that do not apply to a project, such as proof approval for unmarked components, are skipped. OEM Bulk Orders skip to stage 5.
- Intake. Buyer submits the OEM project form, accepts these OEM Program Terms and uploads its license or business documents. Derya targets a decision within 5 business days: accepted, declined or more information needed.
- NDA. For Custom Magazine and Private-Label and New-Model projects, and whenever Buyer will share proprietary designs, the parties sign Derya's mutual NDA by e-signature, or Buyer uploads an NDA already in force with Derya. Work does not proceed until the NDA is executed.
- Specifications and artwork. Buyer uploads its specifications, vector artwork (AI, EPS, SVG or PDF), marking text, color references and packaging and UPC requirements.
- Proof approval. Derya issues a marking layout or proof. Buyer approves it or requests changes through the portal.
- Quote, purchase order and deposit. Derya issues a written quote. Buyer submits its purchase order and, where required, the deposit. The lead time starts when Derya accepts the purchase order in writing and the deposit has cleared.
- Golden sample. For Custom Magazine and Private-Label and New-Model projects, Derya provides a pre-production sample. Buyer approves or rejects it in writing within 10 business days; a sample not rejected within that time is deemed approved.
- Production and quality control. Derya builds and inspects the order and posts status updates to the portal.
- Shipment. Once any balance due is paid, Derya ships and posts the tracking information to the portal.
4.1 The OEM portal. Derya manages each project through its online OEM portal, where Buyer sees the current stage, the actions waiting on Buyer, every file and the full message history. Approvals, uploads and messages Buyer submits through the portal are Buyer's written approvals and notices under these terms.
5Artwork, samples, tooling and delivery
5.1 Artwork. Buyer supplies print-ready vector artwork. Derya may charge for artwork preparation when the files supplied are not production-ready. Derya is not responsible for errors in Buyer-supplied artwork or in a proof Buyer has approved.
5.2 Approved proofs and samples are final. A change requested after proof or golden-sample approval is a change order and may change the price, deposit and lead time.
5.3 Tooling. Tooling and NRE are quoted separately. Tooling made for a Buyer-specific design is used only for that Buyer's orders. Title to all tooling remains with Derya or its supplier unless the parties agree otherwise in a signed writing. Derya may retire Buyer-specific tooling after 24 months without an order, on 30 days' written notice to Buyer.
5.4 Inspection. Buyer inspects each shipment on receipt and reports any nonconformance with the approved proof or golden sample within 10 business days of delivery. Firearm shortages must be reported within 24 hours of receipt, as Derya's Terms and Conditions require.
6Intellectual property, trademarks and compliance
6.1 Buyer's materials. Buyer warrants that it owns or is licensed to use every mark, logo, design, artwork and specification it supplies, and grants Derya a limited license to use them solely to fill Buyer's orders. Buyer will defend, indemnify and hold Derya harmless from any claim that Buyer's materials infringe or misappropriate a third party's rights.
6.2 Third-party marks. Derya will not apply a third party's trademark to any Product or its packaging. Compatibility is stated only in the form "for" the brand and model, for example "9mm 17-round magazine for Glock 17", with a statement that Buyer and Derya are not affiliated with the brand owner. Buyer's packaging, listings and advertising for the Products must follow the same rule.
6.3 Derya's property. Derya's designs, specifications, tooling, processes and know-how remain Derya's property. Buyer receives no license to them beyond the right to resell the Products it buys, and will not reverse engineer the Products or have them copied.
6.4 Firearm markings. Every firearm Derya manufactures or imports carries the markings 27 CFR 478.92 requires, including the serial number, model, caliber or gauge, the manufacturer's name and, as applicable, the importer's name, city and state and the country of manufacture. Buyer's brand may be added to a firearm but does not replace a required marking unless ATF has approved a marking variance. Derya sets the final marking layout.
6.5 Licensing. Buyer keeps a current Federal Firearms License on file with Derya and, for NFA items, current Special Occupational Tax status. Derya ships firearms only to the licensed premises on file.
6.6 State and local law. Buyer is solely responsible for complying with every law that applies to its resale of the Products, including magazine-capacity limits, threaded-barrel restrictions, handgun rosters and assault-weapon laws, and must order the compliant configuration for restricted jurisdictions. Derya's compliance designations are for information only and are not a warranty.
6.7 Export. Buyer will not export, re-export or transfer any Product outside the United States without the required U.S. government authorization.
7Cancellation, warranty and general terms
7.1 Non-standard products. Private-label, custom, component and new-model products, and Standard OEM Items, are non-cancellable and non-returnable once Derya accepts the purchase order.
7.2 OEM Bulk Orders. Cancellations and returns of OEM Bulk Orders follow Derya's Terms and Conditions, including the RMA requirement and restocking fee.
7.3 Changes. Any change to an accepted order requires a written change order agreed by both parties, which may change the price, deposit and lead time.
7.4 Warranty. Products sold under the Derya brand carry Derya's published limited warranty. For unbranded and private-label Products, Buyer provides warranty service to its own customers, and Derya warrants to Buyer only that those Products conform to the approved specification and are free from defects in materials and workmanship for 12 months from shipment. Derya's sole obligation under that warranty is, at its option, repair, replacement or credit. The warranty disclaimer and limitation of liability in Derya's Terms and Conditions apply to every OEM order.
7.5 Confidentiality. Pricing, quotes, specifications and project information are confidential and may not be shared outside Buyer's organization. Where the parties have signed an NDA, it also governs.
7.6 Derya's Terms and Conditions. These OEM Program Terms supplement Derya's Terms and Conditions in effect on the date Derya accepts the purchase order, which apply to every OEM order. Where the two conflict, these OEM Program Terms control, and a project agreement signed by an authorized Derya officer controls over both. Florida law governs, with exclusive venue in the state or federal courts in Duval County, Florida.
7.7 Updates. Derya may update these OEM Program Terms. The version Buyer accepted at intake governs that project through shipment of its first production run.
Pick your next step
Apply for an OEM account
Have these ready
- Company and brand details
- Your Federal Firearms License, required for any firearm project
- A resale certificate or other proof of business status if you buy magazines, parts or accessories only
- Your estimated 12-month volume
- Trade references, if you're applying for payment terms
We review every application within 5 business days. Approved accounts receive OEM pricing by email.
Start an OEM project
Have these ready
- The Derya model or SKU your project starts from
- Your quantity, checked against the minimums above
- Your target delivery date
- Vector artwork (AI, EPS, SVG or PDF), marking text and color references
- Any NDA already in force with Derya
Ordering tubes, springs, followers or other pieces of a standard item? Submit them here as a project. Components are custom orders with a 90 to 120 day lead time.
New to the program? Apply for an account first. We decide on every project within 5 business days.
Place an OEM bulk order
What you can order
- Magazines · 200 per master case
- Barrels · 24 per master case
- Slides
- Other parts
- Accessories
Order rules
- $10,000 minimum per purchase order. Mix items freely; magazines and barrels in full master cases.
- Pricing is on the OEM price sheet sent with your account approval.
- Orders ship within 10 business days, unless an item is out of stock.
- Pay on approved terms, or prepay by check, ACH or wire.
- You certify that your order complies with the magazine-capacity, threaded-barrel and other laws of the ship-to state.
Need tubes, springs, followers or other pieces of a standard item made for you? That is a custom component order (90 to 120 days). Start a project instead.
Bulk orders are for approved OEM accounts. Apply here if you're new.
Glock is a registered trademark of Glock, Inc. Derya is not affiliated with, authorized by or endorsed by Glock, Inc. References to Glock models describe compatibility only.